PROJECT TITLE: 14 lane connectivity from Nagaon to Itanagar in Arunachal Pradesh under SARDP NE work (Phase A). 4 laning of NH 52 from the end of Biswanath Chariali Byepass (KM 208/00) to Gohpur (km 265/500) (Total Length = 57.50 km) in Sonitpur District in the State of Assam. CONTRACTOR :RAMKY TK JV CLIENT :NHIDCL |
PROJECT TITLE: 22-laning of existing Akajan- Likabali Bame road on EPC basis from design km. 12.000 to km. 33.000 (existing km. 12.000 to km. 36.000) in the state of Arunachal Pradesh under SARDP-NE Length: 21.8 km CONTRACTOR :JKM - KCL JV CLIENT :NHIDCL |
PROJECT TITLE: 3Strengthening & Widening of NH-44 from Km. 173/125 to Km. 175/900,Km. 191/00 to km 197/00,Km. 197/00 to Km 206/500 of NH-44(Length = 18.275 Km.) in EPC mode under PWD Silchar NH Division, in the state of Assam. Length: 18.275 KM CONTRACTOR :M/s SGCCL - DP JV CLIENT :MoRTH |
PROJECT TITLE: 4Re-Alignment of NH-37 from Bogibeel Junction at Km. 581.700 to Km. 597.147 under SARDP-NE (Total length 15.447Km.) in the State of Assam (Dibrugarh Bypass) Length: 15.447 KM CONTRACTOR :M/s ABCI - JKM JV CLIENT :NHIDCL |
PROJECT TITLE: 5Development & upgradation of 4 Lanning of NH52 from Gohpur to Holongi in the State of Assam. Length: 10.00 KM CONTRACTOR :ECI Engineering & Construction Company Ltd CLIENT :NHIDCL |
PROJECT TITLE: 6Construction of 2-lane Patherkandi Bypass with paved shoulders under Annual Plan for the year 2014-15 in Krimganj NH Division in the state of Assam. Length: 9.224 CONTRACTOR :M/s Dipayan Paul & Chanchal Paul JV CLIENT :The Chief Engineer, PWD (NH Works), Assam, Chandmari, Guwahati - 3 |
PROJECT TITLE: 72 laning of NH 61 Road from KM 56.00 to KM 72.40 in the state of Nagaland on EPC Mode. CONTRACTOR :T K Engineering CLIENT :Ministry of Road, Transport & Highway |
PROJECT TITLE: 82 laning of NH 61 Road from KM 40.000 to KM 56.000 in the state of Nagaland on EPC Mode. CONTRACTOR :T K Engineering CLIENT :Ministry of Road, Transport & Highway |
PROJECT TITLE: 9Improvement of City portion of Dimapur city of NH 39 (Old) from Nagaland gate (km 106.900) to Patkai Bridge (km 124.200) of NH 39 (Old) (Length - 17.3km) in the state of Nagaland in EPC mode. CONTRACTOR :T K Engineering CLIENT :Ministry of Road, Transport & Highway |
PROJECT TITLE: 10Upgradation to double lane with paved/hard shoulder of Garobadha - Mankachar road from KM 34.483 to KM 48.848 in Meghalaya under Inter State Connectivity Scheme (ISC) on EPC Mode in the state of Meghalaya. CONTRACTOR :M/s P. K.and Company – S W Marwein (JV) CLIENT :Ministry of Road, Transport & Highways |
PROJECT TITLE: 11Rehabitation of Lowarpua-Kanmon Road Under World Bank financed Assam State Road Project (ASRP) for the year 2015-16 CONTRACTOR :TK - CP JV CLIENT :Assam State Road Projects (Funded by World Bank) |
PROJECT TITLE: 12Two lanning of Roing - Hunli Road to Hunli Anini Road - New Alignment (Length - 75 km) in the state of Arunachal Pradesh CONTRACTOR :DRA - ITL (JV) CLIENT :NHIDCL |
PROJECT TITLE: 13Widening to 2-lane with geometric improvements of Tura-Dalu Roadunder JICA funding from KM 85.00to KM 95.00 & 101.000 to 145.00 to 2-lane with paved shoulder of Tura Dalu Section of NH 51 in the State of Meghalaya CONTRACTOR :Manaranjan Brahma CLIENT :NHIDCL |
PROJECT TITLE: 14Improvement and widening of Ranikor-Maheshkola-Mahadeo-Rongra-Baghmara Road from Km0.00 to Km139.000 under SARDP-NE Phase-Aunder EPCmode in the state of Meghalaya. CONTRACTOR :Dhar Construction CLIENT :NHIDCL |
PROJECT TITLE: 152-Laning of Potin to Pangin section of NH-13 from KM 44+350 to KM 77+950 KM (Package II) in the state of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE on EPC basis. CONTRACTOR :DRA Infra Pvt.Ltd CLIENT :Ministry of Road, Transport & Highway |
PROJECT TITLE: 16Four Laning of NH-37 from end of Nagaon Bypass to Rangagara (CH: 288.600 KM to CH:297.000 KM) in Nagaon District in the State of Assam under SARDP-NE, Phase A on EPC Mode (Nagaon). CONTRACTOR :Ganga Sagar Singh,Civil Contractor Class A Contractor Regd.with PWD,Lucknow CLIENT :Assam,PWD |
PROJECT TITLE: 17Strengthening of existing 2 lane with paved shoulder from Km.445/00 to 455/00 and Km.475/00 to 500/00, km (Total Length=35.00 km) of N.H.-52 (New N.H.-15) under Annual Plan for the year of 2018-19 under Nagaon N.H. Division, Nagaon in the State of Assam on EPC mode. (Silapathar Nahata) CONTRACTOR :M/s Sanwar Mal Khetawat CLIENT :Assam,PWD |
PROJECT TITLE: 18Periodic Renewal for the year 2019-20 from Km. 398.050 TO Km. 408.000 ( Total length = 9.95 Km. ) of NH-15 under PWD Nagaon N.H. division, Nagaon in the state of Assam on EPC mode. (Chamajan). CONTRACTOR :M/s Premdhan Construction CLIENT :Assam,PWD |
PROJECT TITLE: 19Strengthening of 2 lane with paved shoulder of NH-54 from 12th km to 40th km under Annual plan for the year 2018-19 under EPC mode under PWD, N.H. Division, Silchar in the State of Assam. (Silchar). CONTRACTOR :UCN Construction Company Pvt.Ltd. CLIENT :Assam,PWD |
PROJECT TITLE: 20Stage strengthening to N.H.-53 (Silchar Badarpur section) from Km.3.65 to KM.6.25 and NH-54 at 21st. km, 27th km to 30th km, 35th km, 36th km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division, Silchar in the state of Assam. (Silchar ). CONTRACTOR :Binni Construction CLIENT :Assam,PWD |
PROJECT TITLE: 21Stage Strengthening from km.928/00 to 938/00 ( Total length =10.00km) of NH-17 (new)/ NH-31 (old) under Abhayapuri Construction Division, Abhayapuri for the Annual Plan 2019-20 in the state of Assam under EPC Mode. (Abhayapuri ). CONTRACTOR :M/s G.L.Agarwalla CLIENT :Assam,PWD |
PROJECT TITLE: 22Stage Strengthening from km.42/00 to km.52/00 on NH-37 (old)/ NH-17 (new) for the year 2019-20 under Guwahati N.H. Division in the state of Assam under EPC Mode. (Dudhnoi ). CONTRACTOR :M/s G.L.Agarwalla CLIENT :Assam,PWD |
PROJECT TITLE: 23Periodical Renewal to N.H.-15 (Old N.H.-52) from Km.100.00 to 109.00 for the year 2019-20 in the state of Assam on EPC mode Job. (Dhekiajuli ). CONTRACTOR :M/s Sanwar Mal Khetawat CLIENT :Assam,PWD |
PROJECT TITLE: 24Stage Strengthening from Km. 0/00 to Km.30/00 of NH-39 (old) in the state of Assam under Golaghat N.H. Division under EPC Mode under AP 2019-20. (Golaghat ). CONTRACTOR :M/s G.L.Agarwalla, CLIENT :Assam,PWD |
PROJECT TITLE: 25Periodic Renewal for the year 2010-2020 from Km 365/000 to Km 373/000 (Total length = 8.00 Km) of NH- 15 under Nagaon NH Division,Nagaon in the State of Assam. CONTRACTOR :M/s Premdhan Construction CLIENT :Assam,PWD |
PROJECT TITLE: 26Periodic Renewal for the year 2019-2020 from Km 373/425 (Total length = 23.425 Km) of NH-15 under ngaon Division Nagaon on EPC Mode in the State of Assam. CONTRACTOR :: M/s Premdhan Construction CLIENT :Assam,PWD |
Opp. SBI Chandmari Branch,
1st Floor, TKD Aloy, MRD Road,
Chandmari, Guwahati-781021
Contact: +91 9678998643
Email: info@alliance-engineers.in
Email: cyberchang2000@gmail.com
TRIDEEP CHANGMAI
Contact: +91 94355 53556
Contact: +91 90850 53556
Email: cyberchang2000@gmail.com