PROJECT TITLE:Consultancy Services for preparation of DPR for"New 4 Lane road from Patherquarry to Sonsapur along the border of Narengi army camp" CLIENT :The Chief Engineer, P.W.D. (Roads), Assam, Chandmari, Guwahati. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised alignment plan for "Four Laning of Itanagar - Holongi Section of NH-52A From KM 0.000 to KM 19.20 in the State of Arunachal Pradesh (Realignment from CH:6900.00 to CH:10800.00)" CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for “Double Laning of Papu-Yupia-Hoj-Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh Package A :Papu - Yupia Section from km 0 to km 10 CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for "Double Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh. Package B :Yupia - Hoj Section from km 10 to km 32 CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for "Double Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh. Package C :Hoj - Potin Section from km 32 to km 53 CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 28.00 to Km 41.303 in the State of Arunachal Pradesh". CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 57.00 to Km71.597 in the State of Arunachal Pradesh". CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for "2-Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 (Sub soil investigation & Design of RCC double lane Bridge over river Pare at Ch 30.100 Km at Hoj") CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 28.00 to Km 41.303 in the State of Arunachal Pradesh". CLIENT :The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh. |
PROJECT TITLE:Consultancy services including topographic survey, design, drawing and DPR for construction of 2-lane Road from DharapurChariali to LGB International Airport. (Total Length - 4.80 km). CLIENT :The Executive Engineer, P.W.D. Guwahati Road Circle, Guwahati, Assam. |
PROJECT TITLE:Survey and Preparation of DPR for Double Laning of Shantipur to Meka (Extension of NH 37 into Arunachal Pradesh).(Total Length -19.50 km). CLIENT :The Chief Engineer, Highway Zone,PWD, AP, Itanagar, Arunachal Pradesh. Project Period: June 2009 to July 2009. |
PROJECT TITLE:In house preparation of DPR for realignment/improvement of existing 2 lane with paved shoulder of NH-37 in Dibrugarh - Makum - Rupai section and NH-38 from Makum - Lekhapani section in Assam under SARDP-NE Phase-A. (Total Length -20.70 km). CLIENT :The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam. |
PROJECT TITLE:Consultancy Services for Preparation of Detailed Project Report for Rural Roads(PMGSY) in the districts - Kamrup.(Total Length - 456.91 km). CLIENT :The Chief Engineer, PWD, PMGSY Works - Assam, Chandmari, Guwahati-3, Assam. |
PROJECT TITLE:Preparation of DPR and soil investigation (for bridge) from dead end of NH-37 near Saikhowaghat in Assam to join NH-52 near Roing in Arunachal Pradesh on NH-37 extn in Assam. (Job No. SARDP-NE/NH-37/AS/PWD/2008-09/112). (Total Length - 39 km; Bridges : Main span 5 KM, viaduct 14 KM Dholla: 50m, Bandarkhal: 120m & Kundil: 180m); Feasibility Study of proposed bridge over River Brahmaputra (3.50km).). CLIENT :The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam |
PROJECT TITLE:Survey & Investigation including preparation of D.P.R. for the XIth Plan Scheme of NEC. Name of Road: Mairang - Ranigodown -Azra Road (85.00 Km).(Total Length - 85.00 km). CLIENT :The Chief Engineer, P.W.D.(Roads), Meghalaya, NEC Branch, Shillong. Project Period: September 2008 to December 2008. |
PROJECT TITLE:Survey & Investigation including preparation of D.P.R. for the XIthPlan Scheme of NEC. Name of Road: Jowai - Nartiang - Khanduli Road (55.00 Km), Location: 7th to 61st Km.(Total Length - 55.00 Km) CLIENT :The Chief Engineer, P.W.D.(Roads), Meghalaya, NEC Branch, Shillong. Project Period: September 2008 to December 2008. |
PROJECT TITLE:Consultancy services including topographic survey, design, drawing and DPR for construction of alternative 2 Lane Road from Khanapara(Koinadhora) to LGB International Airport.(Total Length - 28.00 km). CLIENTThe Executive Engineer, P.W.D.Guwahati Road Division, Guwahati, Assam. |
PROJECT TITLE:Consulting Services for preparation of Detailed Project report for Rural Roads under Pradhan Mantri Gram SadakYojana for the year 2012-13. (Under Kamrup District, Tinsukia District, Udalguri District). CLIENT :The Chief Engineer, P.W.D.(Roads), Assam, Chandmari, Guwahati-3 |
PROJECT TITLE:Consulting Services for preparation of Detailed Project reportfor "Zoo-Japorigog to Noonmati Road along the hill side" CLIENT :The Chief Engineer, P.W.D.(Roads), Assam, Chandmari, Guwahati-3 |
PROJECT TITLE:Consultancy services including topographic survey, design, drawing and DPR for construction of 2-lane carriage way Road from Existing Airport approach to old A.T. Road from (Garal) and Strengthening of Old A.T. Road from Garal to Dharapur under Additional Central Assistant fund for the year 2008-09. CLIENT :The Executive Engineer, P.W.D. Guwahati Road Circle, Guwahati, Assam. |
PROJECT TITLE:Consulting Services for preparation of Detailed Project reportfor "Zoo-Japorigog to Noonmati Road along the hill side" CLIENT :The Chief Engineer, P.W.D. (Roads), Assam, Chandmari, Guwahati-3 |
PROJECT TITLE:Consultancy services for construction of Indo-Bhutan border road. First Phase from Chikaridanga to Rajagarh SSB Camp.(Total Length - 60.18 km). CLIENT :The Executive Engineer, P.W.D.(NH Division), Rangiya Division, Rangiya, Assam. |
PROJECT TITLE:Detailed topographic Survey along the existing road from Shantipur to Roing along the existing National Highway by taking cross sections at 50m interval and all existing features like rivers, permanent structures, channels,buildings, culverts etc. and developing the geometric design as per IRC and quality calculation.(Total Length - 19.50 km). CLIENT :The Executive Engineer, PWD,Rowing PWD Division, Arunachal Pradesh. |
PROJECT TITLE:Preparation of DPR for up-gradation of 2 lanning of Ratachera - Chauraibari section ofNH-44 under Phase - A of SARDP-NE done by under PWD NH Division, Silchar.(Total Length - 13.47 km). CLIENT :The Executive Engineer, P.W.D.(NH Division), Silchar, Assam. |
PROJECT TITLE:Project Consultancy services Phase-I for the scheme "Raising & Strengthening the Brahmaputra Dyke from Sissikalghar to Tekeliphuta including closing of Breach by Retirement and Anti-Erosion Measures" (To protect Majuli and Dhakuakhana areas against flood devastation by the river Brahmaputra). CLIENT :The Chief Engineer, Water Resources Department, Chandmari, Guwahati-3, Assam. Project Period: October 2008 to December 2008. |
PROJECT TITLE:Surveying through total station equipment including printing for PMGSY projects (DPR) under Guwahati Rural Road Division for 2007-08. CLIENT :The Executive Engineer, P.W.D., Guwahati Rural Road Division, Guwahati, 781001, Assam. Project Period: February 2008 March 2008. |
PROJECT TITLE:Topographic Survey using Total Station Equipment of selected existing
PWD Rural Roads under PMGSY for 2007-08 in the district of Jorhat. CLIENT :The Executive Engineer, P.W.D.,Jorhat Rural Road Division, Jorhat, Assam.Project Period:August 2007 to Nov 2007. |
PROJECT TITLE:Preparation of Detailed project Reports of Roads under PMGSY for the
year 2005-06 under Sonitpur District for the following Seven different work
orders:- CLIENT :The Superintending Engineer,P.W.D., Tezpur Road Circle, Tezpur, Assam & Head of P.I.U., Sonitpur District. Project Period:July 2005. |
Opp. SBI Chandmari Branch,
1st Floor, TKD Aloy, MRD Road,
Chandmari, Guwahati-781021
Contact: +91 9678998643
Email: info@alliance-engineers.in
Email: cyberchang2000@gmail.com
TRIDEEP CHANGMAI
Contact: +91 94355 53556
Contact: +91 90850 53556
Email: cyberchang2000@gmail.com