PROJECT TITLE:


Consultancy Services for preparation of DPR for"New 4 Lane road from Patherquarry to Sonsapur along the border of Narengi army camp"


CLIENT :

The Chief Engineer, P.W.D. (Roads), Assam, Chandmari, Guwahati.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised alignment plan for "Four Laning of Itanagar - Holongi Section of NH-52A From KM 0.000 to KM 19.20 in the State of Arunachal Pradesh (Realignment from CH:6900.00 to CH:10800.00)"


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for “Double Laning of Papu-Yupia-Hoj-Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh Package A :Papu - Yupia Section from km 0 to km 10


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for "Double Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh. Package B :Yupia - Hoj Section from km 10 to km 32


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for "Double Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 under SARDP-NE in the State of Arunachal Pradesh. Package C :Hoj - Potin Section from km 32 to km 53


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 28.00 to Km 41.303 in the State of Arunachal Pradesh".


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 57.00 to Km71.597 in the State of Arunachal Pradesh".


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for "2-Laning of Papu - Yupia - Hoj - Potin Road from km 0 km 53 (Sub soil investigation & Design of RCC double lane Bridge over river Pare at Ch 30.100 Km at Hoj")


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consulting Services for preparation of DPR for revised estimate for "Two Laning of Pashighat Pangin Road from Km 28.00 to Km 41.303 in the State of Arunachal Pradesh".


CLIENT :

The Chief Engineer, P.W.D. (Highway), Arunachal Pradesh, Itanagar, Arunachal Pradesh.

PROJECT TITLE:


Consultancy services including topographic survey, design, drawing and DPR for construction of 2-lane Road from DharapurChariali to LGB International Airport. (Total Length - 4.80 km).


CLIENT :

The Executive Engineer, P.W.D. Guwahati Road Circle, Guwahati, Assam.

PROJECT TITLE:


Survey and Preparation of DPR for Double Laning of Shantipur to Meka (Extension of NH 37 into Arunachal Pradesh).(Total Length -19.50 km).


CLIENT :

The Chief Engineer, Highway Zone,PWD, AP, Itanagar, Arunachal Pradesh. Project Period: June 2009 to July 2009.

PROJECT TITLE:


In house preparation of DPR for realignment/improvement of existing 2 lane with paved shoulder of NH-37 in Dibrugarh - Makum - Rupai section and NH-38 from Makum - Lekhapani section in Assam under SARDP-NE Phase-A. (Total Length -20.70 km).


CLIENT :

The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam.

PROJECT TITLE:


Consultancy Services for Preparation of Detailed Project Report for Rural Roads(PMGSY) in the districts - Kamrup.(Total Length - 456.91 km).


CLIENT :

The Chief Engineer, PWD, PMGSY Works - Assam, Chandmari, Guwahati-3, Assam.

PROJECT TITLE:


Preparation of DPR and soil investigation (for bridge) from dead end of NH-37 near Saikhowaghat in Assam to join NH-52 near Roing in Arunachal Pradesh on NH-37 extn in Assam. (Job No. SARDP-NE/NH-37/AS/PWD/2008-09/112). (Total Length - 39 km; Bridges : Main span 5 KM, viaduct 14 KM Dholla: 50m, Bandarkhal: 120m & Kundil: 180m); Feasibility Study of proposed bridge over River Brahmaputra (3.50km).).


CLIENT :

The Superintending Engineer, P.W.D., N.H. Circle, Dibrugarh, Assam

PROJECT TITLE:


Survey & Investigation including preparation of D.P.R. for the XIth Plan Scheme of NEC. Name of Road: Mairang - Ranigodown -Azra Road (85.00 Km).(Total Length - 85.00 km).


CLIENT :

The Chief Engineer, P.W.D.(Roads), Meghalaya, NEC Branch, Shillong. Project Period: September 2008 to December 2008.

PROJECT TITLE:


Survey & Investigation including preparation of D.P.R. for the XIthPlan Scheme of NEC. Name of Road: Jowai - Nartiang - Khanduli Road (55.00 Km), Location: 7th to 61st Km.(Total Length - 55.00 Km)


CLIENT :

The Chief Engineer, P.W.D.(Roads), Meghalaya, NEC Branch, Shillong. Project Period: September 2008 to December 2008.

PROJECT TITLE:


Consultancy services including topographic survey, design, drawing and DPR for construction of alternative 2 Lane Road from Khanapara(Koinadhora) to LGB International Airport.(Total Length - 28.00 km).


CLIENT

The Executive Engineer, P.W.D.Guwahati Road Division, Guwahati, Assam.

PROJECT TITLE:


Consulting Services for preparation of Detailed Project report for Rural Roads under Pradhan Mantri Gram SadakYojana for the year 2012-13. (Under Kamrup District, Tinsukia District, Udalguri District).


CLIENT :

The Chief Engineer, P.W.D.(Roads), Assam, Chandmari, Guwahati-3

PROJECT TITLE:


Consulting Services for preparation of Detailed Project reportfor "Zoo-Japorigog to Noonmati Road along the hill side"


CLIENT :

The Chief Engineer, P.W.D.(Roads), Assam, Chandmari, Guwahati-3

PROJECT TITLE:


Consultancy services including topographic survey, design, drawing and DPR for construction of 2-lane carriage way Road from Existing Airport approach to old A.T. Road from (Garal) and Strengthening of Old A.T. Road from Garal to Dharapur under Additional Central Assistant fund for the year 2008-09.


CLIENT :

The Executive Engineer, P.W.D. Guwahati Road Circle, Guwahati, Assam.

PROJECT TITLE:


Consulting Services for preparation of Detailed Project reportfor "Zoo-Japorigog to Noonmati Road along the hill side"


CLIENT :

The Chief Engineer, P.W.D. (Roads), Assam, Chandmari, Guwahati-3

PROJECT TITLE:


Consultancy services for construction of Indo-Bhutan border road. First Phase from Chikaridanga to Rajagarh SSB Camp.(Total Length - 60.18 km).


CLIENT :

The Executive Engineer, P.W.D.(NH Division), Rangiya Division, Rangiya, Assam.

PROJECT TITLE:


Detailed topographic Survey along the existing road from Shantipur to Roing along the existing National Highway by taking cross sections at 50m interval and all existing features like rivers, permanent structures, channels,buildings, culverts etc. and developing the geometric design as per IRC and quality calculation.(Total Length - 19.50 km).


CLIENT :

The Executive Engineer, PWD,Rowing PWD Division, Arunachal Pradesh.

PROJECT TITLE:


Preparation of DPR for up-gradation of 2 lanning of Ratachera - Chauraibari section ofNH-44 under Phase - A of SARDP-NE done by under PWD NH Division, Silchar.(Total Length - 13.47 km).


CLIENT :

The Executive Engineer, P.W.D.(NH Division), Silchar, Assam.

PROJECT TITLE:


Project Consultancy services Phase-I for the scheme "Raising & Strengthening the Brahmaputra Dyke from Sissikalghar to Tekeliphuta including closing of Breach by Retirement and Anti-Erosion Measures" (To protect Majuli and Dhakuakhana areas against flood devastation by the river Brahmaputra).


CLIENT :

The Chief Engineer, Water Resources Department, Chandmari, Guwahati-3, Assam. Project Period: October 2008 to December 2008.

PROJECT TITLE:


Surveying through total station equipment including printing for PMGSY projects (DPR) under Guwahati Rural Road Division for 2007-08.


CLIENT :

The Executive Engineer, P.W.D., Guwahati Rural Road Division, Guwahati, 781001, Assam. Project Period: February 2008 March 2008.

PROJECT TITLE:


Topographic Survey using Total Station Equipment of selected existing PWD Rural Roads under PMGSY for 2007-08 in the district of Jorhat.
1) SaruchariGharphalia to AT Road, Bhatempra to NH37, Porbotia to NH37,Gualgaon to Kaibatragaon Road,Puzarichuk to Lahdoigarh Road, New Gharphalia to NH37, Borapaikchuk to Lahdoigarh Road, Dagaon to LahdoigarhRoad, Chagmaichuk to NH37.(Total length 19.829 km).
2) Majuli Road, Oudubiati to Dakhinpat via Kalitagaon,NLK to DhapakGaon,Bongaon to Balichapori, Dhekiakhowa to Lahdoighat Road. (Total length 19.984 km).
3)Morigaon BRN Road, Kakadonga Block 1 to Gar-Ali, KakadongaHabigaon 1 to GarAli,Kamargaon to Neemati Road,Dessoinagar Road,DessoikochBamungaon to J.B. Road,Kolbari to NH37, Mallowkhatgaon Road.(Total length 20.05 km).
4)Panjan Gar-Ali Road, Salaguri Na-Ali Road, Mohimabari to Borholla(BossaBorholla Rd), Hatipara SCP Road,RangajanDholi Road (DholiSonari Road),Borera Road. (Total length 18.244 km).
5)BamunKahar Road, Dangoriatol to Lahdoigarh, ArandharaChuk to NH37,Meleng TE Estate Road to No.1 Fesualchuk, SataiLabourline to NH37,JengraiTiniali to Chikarigaon, PGJH to UjaniRatanpurMiri, PGJH to ChaporiGaon Road. (Total length 25.11 km).
6) Phukanar Ali, Lohpohia Road,AjanBamungaon Road, Chakalating T.E. Road, Bamchuk Road, KB Road to Baruagaon Road, MelengGayangaon to NH37, Dachuk to met. Dhekiakhowa Road, GaraguriKaibatra to Lahdoigarh Road, Hatigarhkomargaon to RoseswarBaruah, Baruachuk to RoseswarBaruah Road, Kathgaon to Lahdoigarh Road.(Total length 28.233 km).
7) BalijanShyamgaon Road, Kachukhat Gar-Ali, Free Sample Grant Road, SukanjanNagabat Road, Boisahabi to Dhodar Ali, Kaligaon to Dhodar Ali,Teliagaon to TBN Road. (Total length 24.175 km).


CLIENT :

The Executive Engineer, P.W.D.,Jorhat Rural Road Division, Jorhat, Assam.Project Period:August 2007 to Nov 2007.

PROJECT TITLE:


Preparation of Detailed project Reports of Roads under PMGSY for the year 2005-06 under Sonitpur District for the following Seven different work orders:-
1) (i) GhograKachari to Narayankati Bengali Road (Length 4.10 km),
(ii) Thelamora to Missamari Road (Length 5.38 km).(Package No. AS - 22-41)
2) (i) Mission Chariali to Debisingghat Road (Length 3.51 km),
(ii) Dekargaon to Tamulijan Road (Length 2.77 km),
(iii) Halleswar to Bindukuri (Length 3.20 km).(Package No. AS - 22-40)
3) (i) N.H. - 52 to Meat Supply to Tubukijan Road (Length 6.00 km),
(ii) Akabasti to Gudamghat Road (Length 3.48 km).(Package No. AS - 22-39)
4) (i) Tupia to Silonighat Road (Length 2.00 km),
(ii) Nagsankar to Itakhola Road (Length 7.49 km)(Package No. AS - 22-38)
5) (i) SooteaBorpam Road (Length 3.49 km),
(ii) Panibharal to Karaini Road (Length 6.00 km)(Package No. AS - 22-37)
6) (1) SereliaPathar to Bihmarigaon Road(length 9.47 km)(Package No. AS - 22-36)
7) (i)N.H. - 52 to Doimalu via Jorhatiagaon (Length 7.00 km),
(ii)N.H. -52 to Brahmajan Delhousie Kacharigaon Road (Length 2.50 km) (Package No. AS - 22-35)


CLIENT :

The Superintending Engineer,P.W.D., Tezpur Road Circle, Tezpur, Assam & Head of P.I.U., Sonitpur District. Project Period:July 2005.

Twitter

Contact Us

Opp. SBI Chandmari Branch,

1st Floor, TKD Aloy, MRD Road,

Chandmari, Guwahati-781021

Contact: +91 9678998643

Email: info@alliance-engineers.in